Boiler Company SERIES 3 Dokumentacja

Przeglądaj online lub pobierz Dokumentacja dla Grzejniki wodne i kotły Boiler Company SERIES 3. Boiler Company SERIES 3 Specifications Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - CT SERIES BOILERS

CT SERIES BOILERSCT-6 CT-10 CT-15 CT-20CT-25 CT-35 CT-50INSTALLATION, OPERATION andMAINTENANCE MANUALCOLUMBIA BOILER COMPANYPOTTSTOWN, PENNS

Strona 2 - Figure 1

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 7 -OIL SUPPLY PIPINGConsult the burner section of this manual for oil line type and sizing requirements for

Strona 3 - Table Of Contents

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 8 -FEEDWATER PIPINGFigure 2Do not fill the boiler until the installation is complete and you are ready to fi

Strona 4 - IMPORTANT

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 9 -STEAM OUTLETConnect the field steam piping to the outlet on top of boiler. See Figure 3. If a main steamm

Strona 5

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 10 -Figure 4 BLOWDOWN PIPING

Strona 6 - SERVICE POLICY

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 11 -CLEANING AND FILLING A NEW STEAM BOILERIn order to minimize the corrosive effects of raw water oxidation

Strona 7 - INSTALLATION

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 12 -OPERATING THE BOILERNOTE: Although your new Columbia Boiler has been test fired at the factory, it must

Strona 8

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 13 -um gauge, 0-300 PSI pressure gauge, carbon dioxide or oxygen analyzer, carbon monox-ide tester, smoke gu

Strona 9

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 14 -GAS BURNERSBOILERBURNERMODELPOWER FLAMECT-6 5/16 (.313) / 3.5" “D”(.242) / 3.5"JR15A-10POWER F

Strona 10

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 15 -BURNER START UP AND TEST INFORMATIONFor a new boiler start up, or for troubleshooting an existing instal

Strona 11 - Figure 3

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 16 -OPTIONAL SIDEWALL VENTING (and Combustion Air intake)Installation InstructionsGeneralThis section provid

Strona 12

CT BOILER WITH PARTIAL SECTIONFigure 1

Strona 13 - Figure 4

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 17 -InstallationThe Columbia Model CT Direct Vent Series Steam Boiler is furnished completely piped,wired, a

Strona 14

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 18 -All through the wall connections must adhere to safety standards set forth by standardbuilding practices

Strona 15 - OPERATING THE BOILER

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 19 -BOILER ROOMLightingThe boiler room should be well lighted and should have a source of emergency lighting

Strona 16

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 20 -REQUIRED BOILER MAKE-UP AIROPENING SQUARE HOLE ROUND PIPEMIN. SQUARE SIZE - INCHES SIZE - INCHESINCHES(A

Strona 17

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 21 -DESCRIPTION OF BOILER COMPONENTSRefer to the drawings in this manual for the location of the following l

Strona 18

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 22 -pump motor switches of the Warrick Series DF Low Water cut Off and Pump Control. AMotor Starter also pro

Strona 19 - Installation Instructions

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 23 -Safety Limit Pressure ControlThe Safety Limit operates essentially the same as the pressure control desc

Strona 20 - Figure 5

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 24 -DESCRIPTION OF OPTIONAL EQUIPMENTManual Dual Pressure (Optional)A toggle switch is provided in conjuncti

Strona 21 - Figure 6

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 25 -MAINTENANCERECORD KEEPINGAll manufacturers’ literature, spare parts lists, operating and maintenance pro

Strona 22 - BOILER ROOM

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 26 -Monthly Boiler Check & Maintenance List1. Test all fan interlocks.2. Check main burner safety shut o

Strona 23 - (HORSEPOWER) INPUT

Table Of ContentsPARTS WARRANTY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2SERVICE POLICY

Strona 24

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 27 -Gauge GlassThe water gauge glass must be kept clean. Dirt on or in the glass may be mistaken for thewate

Strona 25

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 28 -Blowdown InstructionsTo blow down the boiler, open the slow opening (“Y” type) blowdown valve first. Ope

Strona 26

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 29 -Install the plate assembly in the boiler, evenly spaced as possible. Set the yoke over thebolt, install

Strona 27

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 30 -Millboard top gasket part numbers:CT-6 332200 CT-10 332210 CT-15 332220 CT-20 332225CT-25 332230 CT-35 3

Strona 28 - MAINTENANCE

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 31 -MAINTENANCE LOG

Strona 29

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 32 -MAINTENANCE LOG

Strona 30

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 33 -TESTING OF BOILER COMPONENTSRefer to Boiler Check & Maintenance Listsearlier in this section for fre

Strona 31 - Figure 7

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 34 -The burner circuit should be open, signifying the burner circuit is broken.10. Continuity across Termina

Strona 32 - Figure 8

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 35 -Danfoss Operating Pressure ControlTesting While in Operation.1. Start the burner and allow the boiler pr

Strona 33

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 36 -3. Increase the pressure in the boiler until the pressure is higher than the setting on the controller.

Strona 34 - MAINTENANCE LOG

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 1 -IMPORTANT1. Read and familiarize yourself with this installation, oper-ation, and maintenance manual befo

Strona 35

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 37 -3. Start the burner. After the prepurge is complete, the pilot will light and indicate between 1-1/2 and

Strona 36 - TESTING OF BOILER COMPONENTS

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 38 -Flame Failure Test1. Let burner operate normally for five minutes, then manually shut off the fuel sup-p

Strona 37

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 39 -WATER TREATMENTProper treatment of make-up water and boiler water is necessary to prevent scale, or othe

Strona 38

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 40 -for the precipitation of scale forming salts before scale is deposited.Below a pH of 5.0 the water is ac

Strona 39

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 41 -High boiler solids will lead to foaming, priming, surging and carry over. These problemscan be overcome

Strona 40

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 42 -RETURN SYSTEMS (Optional)Pump OperationThe boiler feedwater pump is controlled by probes sensing the wat

Strona 41

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 43 -BLOWDOWN SEPARATOR (Optional)The blowdown separator design incorporates an internal water seal at the ou

Strona 42 - WATER TREATMENT

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 44 -TROUBLE SHOOTINGThe first step in trouble shooting is to have a qualified service technician, with the r

Strona 43

APPENDICES

Strona 44

REPLACEMENT PARTS FOR CT BOILERSWITH PANEL-BOX & WARRICK DF LWCO,WITH PRESSURETROLS IN/ON PANEL BOXPART OF CT-35 & CT-50 W/OILBURNER ONLY.

Strona 45 - RETURN SYSTEMS (Optional)

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 2 -LIMITED PARTS WARRANTYThe Columbia Boiler company (hereinafter Columbia) warrants the burner components a

Strona 46 - BLOWDOWN SEPARATOR (Optional)

PANEL BOX - INSIDE VIEWDWG CT-546-AFOR USE WITH REPLACEMENT PARTS LISTWARRICK PROBE ASSEMBLY - CT SERIESDWG. CT-415

Strona 47 - TROUBLE SHOOTING

NOTES_________________________________________________________________________________________________________________________________________________

Strona 48 - APPENDICES

REPLACEMENT PARTS FOR CT SERIES BOILERS150 PSI w/ Panel Box with Pressure Controls & Warrick LWCO/Pump ControlREF. No.† DESCRIPTION BOILER MODEL I

Strona 49 - BURNER ONLY

REPLACEMENT PARTS FOR CT SERIES BOILER150 PSI w/ Panel Box with Pressure Controls & Warrick LWCO/Pump ControlREF. No.† DESCRIPTION BOILER MODEL IT

Strona 50 - ANEL BOX - INSIDE VIEW

GAS TRAIN PIPING DIAGRAM forCT-15 BOILERw/POWER FLAMEJR15A-10 GAS BURNER &CT-20 BOILERw/POWER FLAMEJR30A-12 GAS BURNERGAS TRAIN PIPING DIAGRAM for

Strona 51

GAS TRAIN PIPING DIAGRAM forCT-25 BOILERw/POWER FLAMEJR30A-12 GAS BURNER &CT-35 BOILERw/POWER FLAMEJR50A-15 GAS BURNERGAS TRAIN PIPING DIAGRAM for

Strona 52

CT-6/10 w/ P.F. CT-15 w/ P.F. JR15A-10 CT-25 w/ P.F. JR30A-12 CT-35 w/ P.F. JR50A-15 CT-50 w/ P.F. C2-G-20AJR15A-10 (3/4") CT-20 w/ P.F. JR30A-12

Strona 53 - REV. MAY 2006

BOILER WIRING DIAGRAMSEE THE BURNER SECTIONIN THE BOILER MANUAL BINDERFOR THE APPLICABLE WIRING DIAGRAMSFOR THIS BOILER.

Strona 55

WARRICK CONTROLS • ONE COWLES ROAD • PLAINVILLE, CT 06062-1198PHONE: (860) 793-4579 • FAX: (860) 793-4580DIMENSIONAL DIAGRAMEither “G” tab can be used

Strona 56 - CTGTPL01 REV. MAY 2006

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 3 -SERVICE POLICYAnything mechanical will inevitably need servicing. Steam and hot water boilers are rou-tin

Strona 57

OPERATION OF WARRICK DUAL FUNCTION CONTROLS5/95 PRINTED IN U.S.A.

Strona 58

INSTALLATION OF WARRICK SERIES 3C & 3K ELECTRODE FITTINGS

Strona 60 - 5/95 PRINTED IN U.S.A

OPERATION OF WARRICK SERIES 26 CONTROLS5/93

Strona 67

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 4 -INSTALLATIONThe Columbia Model CT Steam Boiler is furnished completely piped, wired, and assem-bled. It h

Strona 68

MODEL NO. CT-6 CT-10 CT-15 CT-20 CT-25 CT-35 CT-50RATINGS:Horsepower 6 9.5 15 20 25 35 50Gas INput (BTU per hour) 252,000 399,000 630,000 840,000 1,05

Strona 70 - CT SPECIFICATIONS AND DATA

PRINTED IN U.S.A.CC-6427500 - 7/08America’s Most Trusted Name in Industrial, Commercial and Residential BoilersCOLUMBIA®BOILER COMPANYP.O. Box 1070, P

Strona 71

FM-148 COLUMBIA BOILER COMPANY, REV 6-06- 5 -may be used in straight sections with a barometric draft regulator. Tees, however, shouldnot be used for

Strona 72 - BOILER COMPANY

CAPACITY OF PIPE - CUBIC FEET OF GAS PER HOURAT 0.2" W.C. PRESSURE DROPEquivalent1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 4&qu

Komentarze do niniejszej Instrukcji

Brak uwag